ENVIRONMENTAL MANAGEMENT PLAN CONSULTANT SUPERVISION

11.1 INTRODUCTION

This plan outlines the steps and measures to be taken by Contractor so that all construction activities required for the construction and completion of the PLTU Unit 3 are carried out in a safe and hygienic manner consistent with proven good practice, and comply with all safety, security and health statues, laws, regulations, codes of practice and other things relevant to health and safety that may from time to time apply to the works.

11.2 STATUTORY AND CONTRACTUAL OBLIGATIONS

All statutory legislation that are in force during the period of contract will be complied with, including:

- Relevant Indonesian Laws and Regulations

- Environmental Protection (ISO14000 Standard)

- The Contract signed with the Owner

- Relevant Regulations of Contractor

11.3 ROLES AND RESPONSIBILITIES

a) Project Manager

· Develop, implement and maintain an effective Environmental Management Plan at site.

· Ensure compliance with applicable regulations.

· Ensure regular meetings are being held to discuss and resolve environmental issues.

b) Environment Team

To conduct regular self audit on the Environmental Management at site including environmental monitoring for air, noise and water as well as all necessary laboratory analysis throughout the duration of the construction period.

c) Environment Officer

· Assist the Project Manager in developing, implementing and maintaining of an effective Environmental Plan at site.

· Advise and coordinate all matters pertaining to environmental management

· Performing the duties of the Secretary to the Environmental Management Team.

· Investigate and report on incidences and non-conformance.

· Collect, update and maintain proper records on environmental issues.





d) Environment staff

Assist the Environmental Engineer/SHE Officer on the day-to-day running of the Environmental Management.

11.4 ENVIRONMENTAL MONITORING AND AUDIT

The consultant construction site shall actively assist PT. PLN (Persero) Pembangkitan Sulmapa to monitor construction of the power plant to comply with the standard and environment, review, evaluate and assist the contractor in controlling environment pollution and ecology and work safety control.

11.4.1 Water Quality

Monthly monitoring of water quality will be conducted. Water samples in water courses downstream from point of discharge of all silt trap ponds, site office and accommodation premises will be collected for testing.

The standards quality for living water and waste water shall refer to the Decree of Minister of Environment No.51/1995:

a) Water Quality Discharge Requirements refer to the Contract Document

11.4.2 Air Quality

Air quality monitoring will be undertaken once in three months. The air monitoring locations will be sited within the project site as well as at the settlements/residential areas within 1 km of the project site boundary.

The standards quality for ambient air shall refer to the Government Decree no 41, May 26, 1999 concerning the National Ambient Level Standard of Air Pollutant.

The Parameters to be monitored during the air monitoring program refer to the the Contract Document

11.4.3 Noise Levels

Noise level monitoring will be conducted at the residential areas adjacent the boundary of the project site, the workers and staffs camp.

The codes and standards for noises are as the following:

· PLN's Standards (SPLN 46-1: 1981 and SPLN 46-2:1981)

· US Department of Labor, Occupational Safety security and health Act 1970

· ANSI SI-13-1971 and appropriate standards approved by the Owner.

Parameters to be monitored are:
Parameters
Required Limit in Contract Document
Noise Level (outside boundary) :

  • during daytime(6am-10pm)
  • during nighttime(10pm-6am)


Detailed requirement for the noise Contract of Contractor